From: route@monster.com
Sent: Monday, October 26, 2015 10:58 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jason King
(716)310-6104 OBJECTIVE: To obtain a position in
the engineering field, with the ability to prove my potential as a valued
employee and further prosper within the organization. QUALIFICATIONS * Technical Skills
Installation of scanners and GPS equipment.
Experience in troubleshooting and calibrating data collection equipment.
TEMS, Benchmarker, and Software
data collection experience.
EVDO, TDMA, CDMA,GSM and LTE wireless telecom system experience.
Knowledge of Windows, Dos, Internet, Microsoft Word,
Excel, Insite, Invex 3G, Xcal and Netact. * Excellent public
relation skills, ability to create a professional image for clientele and
management at all levels while efficiently accomplishing work objectives.
Ability to accomplish assignments in a timely manner with little to no
supervision. EDUCATION
* ITT Technical Institute, Getzville, New York
Electronics Engineering Technology, Associates Degree, August 1999 EMPLOYMENT Teleworld Solutions Project Time Period: March 2012 to August 2015
Project Time Period: July 2011 to
February 2012 Chantilly, VA Drive Test Engineer: Responsible for performance analysis and
integration of existing and new sites for Sprint LTE network. Perform tests
to measure and assess the coverage, capacity, and performance of mobile
network. Conducted indoor and outdoor performance measurements for single
sites and clusters, as well as, trained new engineers in all aspects of
the Drive Testing process. QChat Field Test Engineer: Duties included but were not limited to
participating on a PTT Communication Technology Project as a Team Lead. In
this position as a QChat/iDEN Field Test Engineer, I was responsible for
testing the QChat Handsets out in the field by drive testing. Executed test
plans and test cases while traveling within multiple markets nationwide.
Worked closely with Operations Manager and Development team to fulfill
clients’ needs on or before the scheduled timing. WFI / AT&T Wireless
Project Time Period: February 2011 to June 2011 Chantilly,
VA Installation & Maintenance Technician II: Installs, tests, and integrates
AT&T equipment at sites. ; Responsible for cell site maintenance of
assigned cells which preventative maintenance as well as repair. ; Ability to
troubleshoot site problems using specifications, drawings, plans, schematics
and manuals. Responsible for all aspects of T1 line from 66 Block to Surge
Arrestor. Worked very closely with switch, and RF Engineering to integrate
base station equipment into network and ensure optimal performance by
following AT&T’s integration procedures.
Pinnacle / AT&T Wireless
Project Time Period: October 2010 to December 2010 Rapid
City, SD Network
Field Engineer: Setup wireless base
station equipment for optimum system performance. Performed duties
in
support of network expansion to ensure new and upgraded equipment is
installed and operating to meet performance criteria.
Maintained company resources such as site inventory, tools, vehicle, test
equipment and spares to insure proper operation and availability. Able to
understand, operate, calibrate and interpret the test results for the various
test equipment. (Anritsu
and PIMpro) Kineticom
/
Sprint
Project Time Period: January 2007
to March 2007
Project Time Period: August 2007 to
August 2009 Rochester/Albany,
NY RF
Engineer: As an RF Engineer,
responsibilities included planning drive routes and testing activities for
specific markets
on high speed wireless broadband called EVDO. Key responsibilities included:
single site functioning test, planning
and executing cluster drives, network comparison testing utilizing Invex 3G
software and In Building
Tests.
Activities included but were not limited to Base Preparation, On-Site
Preparation, RF Optimization, Post Optimization System Performance Support and Outputs. Provided
engineering support with minimal to no supervision. Tek
Systems
Project Time Period: January 2004
to September 2004 Rochester, NY Associate RF Field Engineer: Working on CDMA and TDMA Networks to fulfill Clients
requirements for evaluation of cell sites. The requirements included but were
not limited to: Site surveys; Calibration; Validation and Implementation of
the enhanced 911(E911) testing of Phase I and Phase II. Phase I requires the
PSAP to report the telephone number of the wireless 911 caller and the
location of the antenna that received the call. Phase II requires the PSAP to
provide more specific information on the latitude and longitude location of
the wireless 911 caller. Telcom
Global Solutions, Inc. / Flextronics
Project Time Period: October 2000 to November 2001/
Project Time Period: March 2002 to June 2003 Irving,
TX Associate
RF Engineer: On Site Manager
insuring successful completion of No Key operation. Consulted with clients in
order to target specific goals to ensure the proper arrangement of data
collection for the enhancement of frequency ranges. Designed cell sites
utilizing the Netact Planner Software. Field
Technician: Drive Tester,
collecting ESMR (Guard Band) and PCS data utilizing Benchmarker equipment.
Generated daily map routes. TTK
Wireless Telecom Inc.
Project Time Period: July 2000 to September 2000 Richardson,
TX Sr.
Field Engineer: Assist in cut/over
and performance analyst of an IS-136\TDMA wireless telecom system.
Collected data at each individual tower, insuring all voice channels, at each
sector, work in proper order. Completed cross over tests insuring calls will
transmit properly between towers, utilizing TEMS, Grayson, Comarco equipment
and software data collection. (Ericsson Project) System
& Software Services Inc.
Project Time Period: February 2000 to July 2000 Barrington,
IL Field
Technician: Drive Tester collecting
frequency data for a Lucent CDMA network, planned daily routes and
intergraded Network Data into service assurance solutions. Installation of
800 & 1900 MHZ scanners and GPS equipment with the ability to
troubleshoot and calibrate equipment. Performed work objectives
utilizing Insite Software.
*REFERENCES UPON REQUEST* |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||